• ONSITE MITIGATION CERTIFICATION
    North Dakota Department of Transporation, Executive Office
    SFN 61042 (3-2025)

  •  / /
  • Submit this Certification as soon as possible, after mitigation construction is complete or as soon as it is known changes are needed, to allow time for Environmental Section II to review and make any necessary field changes before the contract is terminated. The form can include multiple sites.

  • The wetland impact table in the plans shows the designed impact acreage and if mitigation was required based on final design.

    If the impact areas changed, attach documentation (i.e. brief description of why the impact changed; table with the wetland number(s); and note designated impact acreage, actual impact acreage; in the as-builts.

  • If the location is to be moved, contact Environmental Section II as soon as possible to verify location. A field visit with the Environmental Section Staff will most likely be needed to verify and help answer the questions below.

  • 0/190
  • 0/190
  • 0/190
  • 0/230
  • 7. Submit “As-Builts” (pdf) surveyed after topsoil placement of the onsite mitigation area(s) and photos (jpg) of the site as an attachment to this certification. Include permanent impact areas if they have changed.

  • Field Certification

  •  / /
  • Browse Files
    Drag and drop files here
    Choose a file
    Cancelof
  •  
  • Should be Empty: