SCOUR PLAN OF ACTION
  • SCOUR PLAN OF ACTION
    North Dakota Department of Transporation, Bridge
    SFN 99999 (4-2025)

  • SECTION 1 - GENERAL INFORMATION

  •  / /
  • SECTION 2 - NBIS CODING AND SCOUR VULNERABILITY

  •  / /
  • SECTION 3 - FLOOD MONITORING (BY BRIDGE OWNERS)

  • SECTION 4 - POST FLOOD INSPECTION (BY CERTIFIED BRIDGE INSPECTORS)

  • SECTION 5 - CLOSURE PLAN AND DETOUR ROUTE

  • Structure Closure should be considered if any of the below criteria have been observed

    • Pressure flow
    • Overtopping approach road or structure
    • New or excessive structure movement/settlement
    • Visible drainage to deck, susperstructure, or substructure
    • Heavy or excessive debris build up at the structure restricting water flow thorugh the structurce
    • Other indications of severe scour at the structure.
  • Proposed Detour Route

    Only required for Category A and Category B bridges
  • 0/750
  • SECTION 6 - POINTS OF CONTACT

  • Monitoring Contact

  • Closure Contact List

  • POA Prepared By

  •  
  • Should be Empty: